MIKE HYDRO hotfix 21-12-2017

This MIKE HYDRO Basin hotfix corrects the enforcing of the maximum allowed downstream release of a Reservoir in the context of the Global ranking allocation algorithm. To account for the maximum release it considers the releases downstream and down releases redirected to a connected hydropower.

FILE INFORMATION

File nameFile size
MIKEZero_2016_171221.zip2.2 MB

Download from US East
- If you are from North America, Latin America, Europe, the Middle East or Africa:

Download from Singapore
- If you are from the Asia-Pacific region: